The queries run in Snowflake against
eia_series_vw and
eia_observations_vw in Fruit Stand’s EIA Energy Data
listing, which
we publish. They were run on November 25, 2026. The 2050 range, the 7%
share in 2025 and the 22% to 33% shares in 2050 match EIA’s own summary in
Data center server energy use grows across the commercial building
stock (May 19,
2026).EIA’s data center series
AEO2026, released April 8, 2026, models data center servers as an end use in the commercial sector, like lighting or space cooling. Each projection case has its own series:
Three things to know before using them:
- The Reference case is now the Counterfactual Baseline. AEO2026
renamed its main case
CB2026. Like the old Reference case, it assumes laws and regulations in force as of December 2025 and leaves out proposed ones. TheAEO2025REFseries is last year’s Reference case, carried in the same dataset for comparison. - The units are quadrillion Btu. Multiply by 293.07 for billion kilowatthours, the factor EIA uses for electricity (3,412 Btu per kilowatthour).
- It’s servers only. The cooling and ventilation that data centers need sit in the commercial sector’s space cooling and ventilation end uses, mixed with every other building’s.
Projections by case
Ten of the eleven AEO2026 cases land within 40 billion kilowatthours of each
other in 2050; they vary the economy, oil and gas supply or technology costs,
which barely move server demand. Only the High Electricity Demand case
changes the data center assumptions: more AI servers, faster growth in
server power draw, and none of the efficiency gains after 2040 that the
baseline assumes (a 10% cut in average power draw every three years). It
ends at 819, rounded here from EIA’s 818.
The last row is the bigger story. A year earlier, AEO2025’s Reference case
had servers at 134 billion kilowatthours in 2030 and 338 in 2050. AEO2026’s
baseline raised 2030 by a third, to 178.
Share of commercial and total U.S. electricity
To put the servers in context, divide by the commercial sector’s building electricity and by total U.S. electricity use, both in the same dataset:
The denominator matters. EIA’s 22% to 33% uses the commercial “Electricity
Subtotal” (
PRC_DELE), which leaves out EV charging at commercial sites.
Divide by all purchased electricity in the sector (DELE_ELC, which includes
it) and you get 19.4% and 29.5% instead.
How much of the growth is data centers
Servers account for a fifth of the growth in U.S. electricity use from 2025
to 2050 in the baseline, and a third in the high-demand case. Cooling adds
more on top: in 2050 the High Electricity Demand case’s commercial space
cooling is 314 billion kilowatthours against 230 in the baseline, the 84
billion difference EIA points to in its article.
Why other forecasts are much higher
Lawrence Berkeley National Laboratory’s 2025 update (June 2026) projects data centers at 649 terawatthours in 2030 in its reference case, 11.8% of U.S. electricity, within a range of 521 to 843. EIA’s baseline has servers at 178 billion kilowatthours (178 TWh) that year, 3.9%. The two aren’t measuring the same thing:
Neither is the official count of today’s use. For that, EIA’s Short-Term
Energy Outlook
(February 2026) says data centers are driving U.S. load growth of 1.9% in
2026 and 2.5% in 2027, fastest in ERCOT and PJM.
The growth you can already measure
EIA’s hourly grid data (EIA-930) doesn’t label data centers, but it shows where demand is rising. Total demand by region, 2019 against 2025:
Texas (ERCOT) grew 27%, almost four times the Lower 48’s 7%. The
Mid-Atlantic region, PJM, grew 5.4%: Northern Virginia’s data centers sit
inside a much larger system whose other loads barely changed. These are
totals, so population growth, industry and crypto mining are in them too.
The Lower 48’s 4,298 terawatthours in 2025 also lines up with AEO2026’s
4,298 billion kilowatthours of total U.S. electricity use that year.
Mistakes that give wrong numbers
- Reading the units as kilowatthours. The AEO series are in quadrillion Btu; 1.52 is 446 billion kilowatthours, not 1.52 of anything electric.
- Grabbing the wrong main case. AEO2026’s main case is
CB2026, not a case named Reference.AEO2025REFis last year’s, with lower numbers. - Adding cooling as servers × 2.9. EIA’s 2.9 is how much more cooling-intensive data center floorspace is than other floorspace, not a multiplier on server energy.
- Comparing EIA with LBNL as if they disagree. One counts servers, the other whole facilities; most of the gap is scope.
Limits of this approach
- National only. All 36 data center series in AEO2026 are U.S. totals. EIA’s article says growth is fastest in the South Atlantic and West South Central divisions (home to Virginia and Texas), but those regional figures aren’t in the series.
- Projections, not measurements. Even the 2025 value is a model estimate; AEO’s history ends in 2024.
- Annual, and updated once a year. AEO2027 will replace these series.
We keep each edition as its own dataset, 12 so far from
AEO.2014toAEO.2026, so you can compare editions as they come.
F.A.Q.
How much electricity do data centers use in the U.S.?
How much electricity do data centers use in the U.S.?
EIA estimates data center servers used about 105 billion kilowatthours in 2025, 7% of commercial-sector building electricity and 2.4% of all U.S. electricity use. Counting whole facilities with cooling, LBNL’s 2024 report estimated 176 TWh in 2023, 4.4% of U.S. electricity.
How much electricity will data centers use by 2030?
How much electricity will data centers use by 2030?
EIA’s AEO2026 projects 178 to 191 billion kilowatthours for servers in 2030, depending on the case. LBNL’s 2025 update projects 649 TWh for whole facilities in its reference case, with a range of 521 to 843 TWh.
What is EIA's Counterfactual Baseline case?
What is EIA's Counterfactual Baseline case?
AEO2026’s main case, called the Reference case in earlier editions. It assumes laws and regulations in force as of December 2025 and leaves out proposed legislation. Its series IDs contain CB2026.
Do EIA's data center numbers include cooling?
Do EIA's data center numbers include cooling?
No. The data center series cover servers. Cooling and ventilation for data center floorspace are counted in the commercial sector’s space cooling and ventilation end uses, which also include every other kind of building.
Where can I download EIA's data center projections?
Where can I download EIA's data center projections?
From EIA’s AEO2026 data tables and its API, or in Snowflake through the EIA Energy Data listing, which carries every AEO2026 case as series. Snowflake Curated Data’s free EIA tables don’t include the Annual Energy Outlook.