By Fruit Stand Team · November 25, 2026 · Guides EIA’s Annual Energy Outlook 2026 projects that data center servers will use 446 to 818 billion kilowatthours of electricity a year by 2050, up from about 105 billion in 2025. That’s 7.4% to 12.7% of all U.S. electricity use, and up to a third of electricity used in commercial buildings. The numbers cover servers only, not cooling. Below are tested queries for EIA’s data center series in every AEO2026 case, the share of commercial and total U.S. electricity, how much of the growth in U.S. demand comes from servers, how EIA’s outlook changed from AEO2025, and the regional demand that has already grown, from EIA’s hourly grid data.
The queries run in Snowflake against eia_series_vw and eia_observations_vw in Fruit Stand’s EIA Energy Data listing, which we publish. They were run on November 25, 2026. The 2050 range, the 7% share in 2025 and the 22% to 33% shares in 2050 match EIA’s own summary in Data center server energy use grows across the commercial building stock (May 19, 2026).

EIA’s data center series

AEO2026, released April 8, 2026, models data center servers as an end use in the commercial sector, like lighting or space cooling. Each projection case has its own series:
Three things to know before using them:
  • The Reference case is now the Counterfactual Baseline. AEO2026 renamed its main case CB2026. Like the old Reference case, it assumes laws and regulations in force as of December 2025 and leaves out proposed ones. The AEO2025REF series is last year’s Reference case, carried in the same dataset for comparison.
  • The units are quadrillion Btu. Multiply by 293.07 for billion kilowatthours, the factor EIA uses for electricity (3,412 Btu per kilowatthour).
  • It’s servers only. The cooling and ventilation that data centers need sit in the commercial sector’s space cooling and ventilation end uses, mixed with every other building’s.

Projections by case

Billion kilowatthours per year: Ten of the eleven AEO2026 cases land within 40 billion kilowatthours of each other in 2050; they vary the economy, oil and gas supply or technology costs, which barely move server demand. Only the High Electricity Demand case changes the data center assumptions: more AI servers, faster growth in server power draw, and none of the efficiency gains after 2040 that the baseline assumes (a 10% cut in average power draw every three years). It ends at 819, rounded here from EIA’s 818. The last row is the bigger story. A year earlier, AEO2025’s Reference case had servers at 134 billion kilowatthours in 2030 and 338 in 2050. AEO2026’s baseline raised 2030 by a third, to 178.

Share of commercial and total U.S. electricity

To put the servers in context, divide by the commercial sector’s building electricity and by total U.S. electricity use, both in the same dataset:
The denominator matters. EIA’s 22% to 33% uses the commercial “Electricity Subtotal” (PRC_DELE), which leaves out EV charging at commercial sites. Divide by all purchased electricity in the sector (DELE_ELC, which includes it) and you get 19.4% and 29.5% instead.

How much of the growth is data centers

Servers account for a fifth of the growth in U.S. electricity use from 2025 to 2050 in the baseline, and a third in the high-demand case. Cooling adds more on top: in 2050 the High Electricity Demand case’s commercial space cooling is 314 billion kilowatthours against 230 in the baseline, the 84 billion difference EIA points to in its article.

Why other forecasts are much higher

Lawrence Berkeley National Laboratory’s 2025 update (June 2026) projects data centers at 649 terawatthours in 2030 in its reference case, 11.8% of U.S. electricity, within a range of 521 to 843. EIA’s baseline has servers at 178 billion kilowatthours (178 TWh) that year, 3.9%. The two aren’t measuring the same thing: Neither is the official count of today’s use. For that, EIA’s Short-Term Energy Outlook (February 2026) says data centers are driving U.S. load growth of 1.9% in 2026 and 2.5% in 2027, fastest in ERCOT and PJM.

The growth you can already measure

EIA’s hourly grid data (EIA-930) doesn’t label data centers, but it shows where demand is rising. Total demand by region, 2019 against 2025:
Texas (ERCOT) grew 27%, almost four times the Lower 48’s 7%. The Mid-Atlantic region, PJM, grew 5.4%: Northern Virginia’s data centers sit inside a much larger system whose other loads barely changed. These are totals, so population growth, industry and crypto mining are in them too. The Lower 48’s 4,298 terawatthours in 2025 also lines up with AEO2026’s 4,298 billion kilowatthours of total U.S. electricity use that year.

Mistakes that give wrong numbers

  • Reading the units as kilowatthours. The AEO series are in quadrillion Btu; 1.52 is 446 billion kilowatthours, not 1.52 of anything electric.
  • Grabbing the wrong main case. AEO2026’s main case is CB2026, not a case named Reference. AEO2025REF is last year’s, with lower numbers.
  • Adding cooling as servers × 2.9. EIA’s 2.9 is how much more cooling-intensive data center floorspace is than other floorspace, not a multiplier on server energy.
  • Comparing EIA with LBNL as if they disagree. One counts servers, the other whole facilities; most of the gap is scope.

Limits of this approach

  • National only. All 36 data center series in AEO2026 are U.S. totals. EIA’s article says growth is fastest in the South Atlantic and West South Central divisions (home to Virginia and Texas), but those regional figures aren’t in the series.
  • Projections, not measurements. Even the 2025 value is a model estimate; AEO’s history ends in 2024.
  • Annual, and updated once a year. AEO2027 will replace these series. We keep each edition as its own dataset, 12 so far from AEO.2014 to AEO.2026, so you can compare editions as they come.

F.A.Q.

EIA estimates data center servers used about 105 billion kilowatthours in 2025, 7% of commercial-sector building electricity and 2.4% of all U.S. electricity use. Counting whole facilities with cooling, LBNL’s 2024 report estimated 176 TWh in 2023, 4.4% of U.S. electricity.
EIA’s AEO2026 projects 178 to 191 billion kilowatthours for servers in 2030, depending on the case. LBNL’s 2025 update projects 649 TWh for whole facilities in its reference case, with a range of 521 to 843 TWh.
AEO2026’s main case, called the Reference case in earlier editions. It assumes laws and regulations in force as of December 2025 and leaves out proposed legislation. Its series IDs contain CB2026.
No. The data center series cover servers. Cooling and ventilation for data center floorspace are counted in the commercial sector’s space cooling and ventilation end uses, which also include every other kind of building.
From EIA’s AEO2026 data tables and its API, or in Snowflake through the EIA Energy Data listing, which carries every AEO2026 case as series. Snowflake Curated Data’s free EIA tables don’t include the Annual Energy Outlook.
To run these queries on EIA’s projections, and every other EIA series, start a free 30-day trial of the EIA Energy Data listing on the Snowflake Marketplace. It’s $150/month after the trial. The schema is in the dataset docs, and retail prices are in Electricity Prices by State: EIA Monthly Data in SQL. Questions? Reach out at contact@fruitstand.dev.