# How Much Electricity Will Data Centers Use? EIA's Forecast

> EIA's AEO2026 projects data center servers using 446 to 818 billion kWh by 2050. Query every case in SQL, see the share of U.S. power and real load growth.

*By [Fruit Stand Team](https://fruitstand.dev/about.md) · November 25, 2026 · Guides*

EIA's Annual Energy Outlook 2026 projects that data center servers will use
446 to 818 billion kilowatthours of electricity a year by 2050, up from
about 105 billion in 2025. That's 7.4% to 12.7% of all U.S. electricity
use, and up to a third of electricity used in commercial buildings. The
numbers cover servers only, not cooling.

Below are tested queries for EIA's data center series in every AEO2026 case,
the share of commercial and total U.S. electricity, how much of the growth
in U.S. demand comes from servers, how EIA's outlook changed from AEO2025,
and the regional demand that has already grown, from EIA's hourly grid data.

> [!NOTE]
>
> The queries run in Snowflake against `eia_series_vw` and
> `eia_observations_vw` in Fruit Stand's [EIA Energy Data
> listing](https://app.snowflake.com/marketplace/listing/GZTYZTG3LO35), which
> we publish. They were run on November 25, 2026. The 2050 range, the 7%
> share in 2025 and the 22% to 33% shares in 2050 match EIA's own summary in
> [Data center server energy use grows across the commercial building
> stock](https://www.eia.gov/todayinenergy/detail.php?id=67704) (May 19,
> 2026\).

## EIA's data center series

AEO2026, released April 8, 2026, models data center servers as an end use in
the commercial sector, like lighting or space cooling. Each projection case
has its own series:

```sql theme={null}
select split_part(series_id, '.', 3) as case_id,
       regexp_substr(name, 'Data Center Servers, (.+), AEO2026', 1, 1, 'e') as case_name,
       series_id
from eia_series_vw
where dataset = 'AEO.2026'
  and series_id like '%.CNSM_NA_COMM_NA_PRC_DATACTRSERV_USA_QBTU.A'
order by case_id;
```

| case\_id | case\_name | series\_id |
| - | - | - |
| AEO2025REF | AEO2025 | AEO.2026.AEO2025REF.CNSM\_NA\_COMM\_NA\_PRC\_DATACTRSERV\_USA\_QBTU.A |
| ALTELEC | Alternative Electricity | AEO.2026.ALTELEC.CNSM\_NA\_COMM\_NA\_PRC\_DATACTRSERV\_USA\_QBTU.A |
| ALTTRNP | Alternative Transportation | AEO.2026.ALTTRNP.CNSM\_NA\_COMM\_NA\_PRC\_DATACTRSERV\_USA\_QBTU.A |
| CB2026 | Counterfactual Baseline | AEO.2026.CB2026.CNSM\_NA\_COMM\_NA\_PRC\_DATACTRSERV\_USA\_QBTU.A |
| ELECTRNP | Alternative Electricity and Transportation | AEO.2026.ELECTRNP.CNSM\_NA\_COMM\_NA\_PRC\_DATACTRSERV\_USA\_QBTU.A |
| HIGHELDMD | High Electricity Demand | AEO.2026.HIGHELDMD.CNSM\_NA\_COMM\_NA\_PRC\_DATACTRSERV\_USA\_QBTU.A |
| HIGHOGS | High Oil and Gas Supply | AEO.2026.HIGHOGS.CNSM\_NA\_COMM\_NA\_PRC\_DATACTRSERV\_USA\_QBTU.A |
| HIGHZTC | High Zero-Carbon Technology Cost | AEO.2026.HIGHZTC.CNSM\_NA\_COMM\_NA\_PRC\_DATACTRSERV\_USA\_QBTU.A |
| HM2026 | High Economic Growth | AEO.2026.HM2026.CNSM\_NA\_COMM\_NA\_PRC\_DATACTRSERV\_USA\_QBTU.A |
| LM2026 | Low Economic Growth | AEO.2026.LM2026.CNSM\_NA\_COMM\_NA\_PRC\_DATACTRSERV\_USA\_QBTU.A |
| LOWOGS | Low Oil and Gas Supply | AEO.2026.LOWOGS.CNSM\_NA\_COMM\_NA\_PRC\_DATACTRSERV\_USA\_QBTU.A |
| LOWZTC | Low Zero-Carbon Technology Cost | AEO.2026.LOWZTC.CNSM\_NA\_COMM\_NA\_PRC\_DATACTRSERV\_USA\_QBTU.A |

Three things to know before using them:

* **The Reference case is now the Counterfactual Baseline.** AEO2026
  renamed its main case `CB2026`. Like the old Reference case, it assumes
  laws and regulations in force as of December 2025 and leaves out proposed
  ones. The `AEO2025REF` series is last year's Reference case, carried in
  the same dataset for comparison.
* **The units are quadrillion Btu.** Multiply by 293.07 for billion
  kilowatthours, the factor EIA uses for electricity (3,412 Btu per
  kilowatthour).
* **It's servers only.** The cooling and ventilation that data centers need
  sit in the commercial sector's space cooling and ventilation end uses,
  mixed with every other building's.

## Projections by case

```sql theme={null}
select split_part(series_id, '.', 3) as case_id,
       round(max(iff(period = '2025', value, null)) * 293.07) as bkwh_2025,
       round(max(iff(period = '2030', value, null)) * 293.07) as bkwh_2030,
       round(max(iff(period = '2035', value, null)) * 293.07) as bkwh_2035,
       round(max(iff(period = '2040', value, null)) * 293.07) as bkwh_2040,
       round(max(iff(period = '2050', value, null)) * 293.07) as bkwh_2050
from eia_observations_vw
where series_id like 'AEO.2026.%.CNSM_NA_COMM_NA_PRC_DATACTRSERV_USA_QBTU.A'
group by case_id
order by bkwh_2050 desc;
```

Billion kilowatthours per year:

| case\_id | bkwh\_2025 | bkwh\_2030 | bkwh\_2035 | bkwh\_2040 | bkwh\_2050 |
| - | -: | -: | -: | -: | -: |
| HIGHELDMD | 105 | 191 | 304 | 449 | 819 |
| HM2026 | 105 | 179 | 261 | 348 | 466 |
| HIGHOGS | 105 | 179 | 260 | 343 | 449 |
| LOWZTC | 105 | 178 | 258 | 341 | 447 |
| CB2026 | 105 | 178 | 258 | 340 | 446 |
| ALTELEC | 105 | 178 | 259 | 340 | 446 |
| HIGHZTC | 105 | 178 | 258 | 340 | 445 |
| ELECTRNP | 105 | 178 | 258 | 340 | 445 |
| ALTTRNP | 105 | 178 | 258 | 339 | 445 |
| LOWOGS | 105 | 177 | 255 | 336 | 439 |
| LM2026 | 105 | 177 | 254 | 331 | 427 |
| AEO2025REF | 105 | 134 | 168 | 213 | 338 |

Ten of the eleven AEO2026 cases land within 40 billion kilowatthours of each
other in 2050; they vary the economy, oil and gas supply or technology costs,
which barely move server demand. Only the High Electricity Demand case
changes the data center assumptions: more AI servers, faster growth in
server power draw, and none of the efficiency gains after 2040 that the
baseline assumes (a 10% cut in average power draw every three years). It
ends at 819, rounded here from EIA's 818.

The last row is the bigger story. A year earlier, AEO2025's Reference case
had servers at 134 billion kilowatthours in 2030 and 338 in 2050. AEO2026's
baseline raised 2030 by a third, to 178.

**Data center server electricity use, AEO2026 Counterfactual Baseline**

## Share of commercial and total U.S. electricity

To put the servers in context, divide by the commercial sector's building
electricity and by total U.S. electricity use, both in the same dataset:

```sql theme={null}
with v as (
  select split_part(series_id, '.', 3) as case_id,
         split_part(series_id, '.', 4) as item,
         period,
         iff(series_id like '%_QBTU.A', value * 293.07, value) as bkwh
  from eia_observations_vw
  where dataset = 'AEO.2026'
    and split_part(series_id, '.', 3) in ('CB2026', 'HIGHELDMD')
    and split_part(series_id, '.', 4) in ('CNSM_NA_COMM_NA_PRC_DATACTRSERV_USA_QBTU',
                                          'CNSM_NA_COMM_NA_PRC_DELE_USA_QBTU',
                                          'CNSM_NA_ELEP_NA_TEL_NA_USA_BLNKWH')
    and period in ('2025', '2030', '2040', '2050')
)
select case_id, period,
       round(max(iff(item like '%DATACTRSERV%', bkwh, null))) as servers,
       round(max(iff(item like '%PRC_DELE%', bkwh, null))) as commercial_buildings,
       round(max(iff(item like '%_TEL_%', bkwh, null))) as us_total,
       round(100 * servers / commercial_buildings, 1) as pct_of_commercial,
       round(100 * servers / us_total, 1) as pct_of_us
from v
group by case_id, period
order by case_id, period;
```

| case\_id | period | servers | commercial\_buildings | us\_total | pct\_of\_commercial | pct\_of\_us |
| - | - | -: | -: | -: | -: | -: |
| CB2026 | 2025 | 105 | 1,510 | 4,298 | 7.0 | 2.4 |
| CB2026 | 2030 | 178 | 1,642 | 4,562 | 10.8 | 3.9 |
| CB2026 | 2040 | 340 | 1,816 | 5,367 | 18.7 | 6.3 |
| CB2026 | 2050 | 446 | 1,983 | 5,995 | 22.5 | 7.4 |
| HIGHELDMD | 2025 | 105 | 1,510 | 4,298 | 7.0 | 2.4 |
| HIGHELDMD | 2030 | 191 | 1,653 | 4,573 | 11.6 | 4.2 |
| HIGHELDMD | 2040 | 449 | 1,990 | 5,542 | 22.6 | 8.1 |
| HIGHELDMD | 2050 | 819 | 2,461 | 6,470 | 33.3 | 12.7 |

The denominator matters. EIA's 22% to 33% uses the commercial "Electricity
Subtotal" (`PRC_DELE`), which leaves out EV charging at commercial sites.
Divide by all purchased electricity in the sector (`DELE_ELC`, which includes
it) and you get 19.4% and 29.5% instead.

## How much of the growth is data centers

```sql theme={null}
with v as (
  select split_part(series_id, '.', 3) as case_id,
         split_part(series_id, '.', 4) as item,
         period,
         iff(series_id like '%_QBTU.A', value * 293.07, value) as bkwh
  from eia_observations_vw
  where dataset = 'AEO.2026'
    and split_part(series_id, '.', 3) in ('CB2026', 'HIGHELDMD')
    and split_part(series_id, '.', 4) in ('CNSM_NA_COMM_NA_PRC_DATACTRSERV_USA_QBTU',
                                          'CNSM_NA_ELEP_NA_TEL_NA_USA_BLNKWH')
    and period in ('2025', '2050')
)
select case_id,
       round(sum(iff(item like '%DATACTRSERV%' and period = '2050', bkwh, 0))
           - sum(iff(item like '%DATACTRSERV%' and period = '2025', bkwh, 0))) as servers_growth,
       round(sum(iff(item like '%_TEL_%' and period = '2050', bkwh, 0))
           - sum(iff(item like '%_TEL_%' and period = '2025', bkwh, 0))) as us_growth,
       round(100 * servers_growth / us_growth, 1) as servers_pct_of_growth
from v
group by case_id
order by case_id;
```

| case\_id | servers\_growth | us\_growth | servers\_pct\_of\_growth |
| - | -: | -: | -: |
| CB2026 | 341 | 1,697 | 20.1 |
| HIGHELDMD | 714 | 2,171 | 32.9 |

Servers account for a fifth of the growth in U.S. electricity use from 2025
to 2050 in the baseline, and a third in the high-demand case. Cooling adds
more on top: in 2050 the High Electricity Demand case's commercial space
cooling is 314 billion kilowatthours against 230 in the baseline, the 84
billion difference EIA points to in its article.

## Why other forecasts are much higher

Lawrence Berkeley National Laboratory's [2025
update](https://eta-publications.lbl.gov/publications/united-states-data-center-energy-2025)
(June 2026) projects data centers at 649 terawatthours in 2030 in its
reference case, 11.8% of U.S. electricity, within a range of 521 to 843.
EIA's baseline has servers at 178 billion kilowatthours (178 TWh) that year,
3.9%. The two aren't measuring the same thing:

| | EIA AEO2026 | LBNL 2025 update |
| - | - | - |
| What's counted | Servers in commercial buildings | Data center facilities, modeled with cooling systems |
| 2030 | 178 to 191 TWh | 649 TWh (521 to 843) |
| Share of U.S. electricity, 2030 | 3.9% to 4.2% | 11.8% (9.5% to 15.3%) |
| Horizon | To 2050, 11 cases | To 2030, scenarios |

Neither is the official count of today's use. For that, EIA's [Short-Term
Energy Outlook](https://www.eia.gov/todayinenergy/detail.php?id=67344)
(February 2026) says data centers are driving U.S. load growth of 1.9% in
2026 and 2.5% in 2027, fastest in ERCOT and PJM.

## The growth you can already measure

EIA's hourly grid data (EIA-930) doesn't label data centers, but it shows
where demand is rising. Total demand by region, 2019 against 2025:

```sql theme={null}
select split_part(split_part(series_id, '.', 2), '-', 1) as region,
       round(sum(iff(year(period_ts) = 2019, value, 0)) / 1e6, 1) as twh_2019,
       round(sum(iff(year(period_ts) = 2025, value, 0)) / 1e6, 1) as twh_2025,
       round(100 * (twh_2025 / twh_2019 - 1), 1) as pct_change
from eia_observations_vw
where series_id in ('EBA.CAL-ALL.D.H', 'EBA.CAR-ALL.D.H', 'EBA.CENT-ALL.D.H',
                    'EBA.FLA-ALL.D.H', 'EBA.MIDA-ALL.D.H', 'EBA.MIDW-ALL.D.H',
                    'EBA.NE-ALL.D.H', 'EBA.NW-ALL.D.H', 'EBA.NY-ALL.D.H',
                    'EBA.SE-ALL.D.H', 'EBA.SW-ALL.D.H', 'EBA.TEN-ALL.D.H',
                    'EBA.TEX-ALL.D.H', 'EBA.US48-ALL.D.H')
  and year(period_ts) in (2019, 2025)
group by region
order by pct_change desc;
```

| region | twh\_2019 | twh\_2025 | pct\_change |
| - | -: | -: | -: |
| TEX | 383.7 | 488.1 | 27.2 |
| SW | 104.5 | 122.5 | 17.2 |
| CENT | 270.1 | 300.0 | 11.1 |
| FLA | 241.6 | 267.8 | 10.8 |
| NW | 347.9 | 373.7 | 7.4 |
| TEN | 159.4 | 170.7 | 7.1 |
| US48 | 4,016.8 | 4,297.8 | 7.0 |
| MIDA | 800.3 | 843.2 | 5.4 |
| CAR | 220.0 | 228.3 | 3.8 |
| CAL | 264.4 | 272.7 | 3.1 |
| MIDW | 707.7 | 725.0 | 2.4 |
| SE | 243.2 | 238.7 | -1.9 |
| NE | 118.3 | 115.3 | -2.5 |
| NY | 155.8 | 151.6 | -2.7 |

Texas (ERCOT) grew 27%, almost four times the Lower 48's 7%. The
Mid-Atlantic region, PJM, grew 5.4%: Northern Virginia's data centers sit
inside a much larger system whose other loads barely changed. These are
totals, so population growth, industry and crypto mining are in them too.
The Lower 48's 4,298 terawatthours in 2025 also lines up with AEO2026's
4,298 billion kilowatthours of total U.S. electricity use that year.

## Mistakes that give wrong numbers

* **Reading the units as kilowatthours.** The AEO series are in quadrillion
  Btu; 1.52 is 446 billion kilowatthours, not 1.52 of anything electric.
* **Grabbing the wrong main case.** AEO2026's main case is `CB2026`, not a
  case named Reference. `AEO2025REF` is last year's, with lower numbers.
* **Adding cooling as servers × 2.9.** EIA's 2.9 is how much more
  cooling-intensive data center floorspace is than other floorspace, not a
  multiplier on server energy.
* **Comparing EIA with LBNL as if they disagree.** One counts servers, the
  other whole facilities; most of the gap is scope.

## Limits of this approach

* **National only.** All 36 data center series in AEO2026 are U.S. totals.
  EIA's article says growth is fastest in the South Atlantic and West South
  Central divisions (home to Virginia and Texas), but those regional figures
  aren't in the series.
* **Projections, not measurements.** Even the 2025 value is a model
  estimate; AEO's history ends in 2024.
* **Annual, and updated once a year.** AEO2027 will replace these series.
  We keep each edition as its own dataset, 12 so far from `AEO.2014` to
  `AEO.2026`, so you can compare editions as they come.

## F.A.Q.

> [accordion] How much electricity do data centers use in the U.S.?
>
> EIA estimates data center servers used about 105 billion kilowatthours in 2025, 7% of commercial-sector building electricity and 2.4% of all U.S. electricity use. Counting whole facilities with cooling, LBNL's 2024 report estimated 176 TWh in 2023, 4.4% of U.S. electricity.

> [accordion] How much electricity will data centers use by 2030?
>
> EIA's AEO2026 projects 178 to 191 billion kilowatthours for servers in 2030, depending on the case. LBNL's 2025 update projects 649 TWh for whole facilities in its reference case, with a range of 521 to 843 TWh.

> [accordion] What is EIA's Counterfactual Baseline case?
>
> AEO2026's main case, called the Reference case in earlier editions. It assumes laws and regulations in force as of December 2025 and leaves out proposed legislation. Its series IDs contain CB2026.

> [accordion] Do EIA's data center numbers include cooling?
>
> No. The data center series cover servers. Cooling and ventilation for data center floorspace are counted in the commercial sector's space cooling and ventilation end uses, which also include every other kind of building.

> [accordion] Where can I download EIA's data center projections?
>
> From EIA's AEO2026 data tables and its API, or in Snowflake through the EIA Energy Data listing, which carries every AEO2026 case as series. Snowflake Curated Data's free EIA tables don't include the Annual Energy Outlook.

To run these queries on EIA's projections, and every other EIA series, start
a free 30-day trial of the [EIA Energy Data listing on the Snowflake
Marketplace](https://app.snowflake.com/marketplace/listing/GZTYZTG3LO35).
It's \$150/month after the trial. The schema is in the [dataset
docs](https://fruitstand.dev/datasets/eia-energy-data.md), and retail prices are in [Electricity
Prices by State: EIA Monthly Data in SQL](https://fruitstand.dev/blog/electricity-prices-by-state.md).
Questions? Reach out at
[contact@fruitstand.dev](mailto:contact@fruitstand.dev).


This documentation is built and hosted on [Mintlify](https://mintlify.com), a developer documentation platform.